Skip to main content
Fieldwork Schedules

2017 BLM soil emissions sampling
Well Name Field # of flux chamber locations (30 min each) # of
VOC
flux
measur
ments
# soil
gas
probe samp
les*
Soil
bact
eria samp
ling?**
72-hr
flux
meas
ure
ment?
Date Time
it
will
take
Who? Notes
CWU 1362-25 Natural Buttes 3 1 1 Yes   Friday, 22 Sep
arrive at 8:30
3 hr Trevor
Randy
COORDINATE WITH RYAN RASUMSSEN
Full cal night befor, 2pt cal on 12
RW 5C1-23B Red Wash 3 1 1 Yes   Friday, 22 Sep
Arrive at 11:30
2.5 hr Trevor
Randy
 Call Scott Atwood (Cell: 435-828-0835) or Randy Hughes (Cell:435-828-8737) to let them know when you will be there.  Call at 8 or 9, and then again when you are done at previous well.
Non-well Red Wash 2 1 1 Yes   Friday, 22 Sep 2 hr Trevor
Randy
 
PTFE sheet n/a 2 1 0 Yes   Friday, 22 Sep 1 hr Trevor
Randy
 
RW 34-22C Red Wash 10 1 1 Yes Yes Tuesday, 26 Sep, then visit on 27, 28, and 29 Sep 5 hr
(26 Sep)
2 hr
(29 Sep)
Trevor
Randy(
26th)
Trevor
(27-28)
Trevor
Seth
(29th)
Do full calibration on the 26th
(or night before, with 2 pt cal on the 26th)
and the 29th.

Fall 2017 GSI Methane Emissions 
fieldwork

Other
  • Some time in 2018-probably spring-one last week of compressor stations in Texas.
  • May-June 2018--4-day sampling with 6 chamber system at two more wells in Clay Basin
  • November 2018--4-day sampling with 6 chamber system at two more wells in Clay Basin
  • Sometime between June and September 2018--final BLM well pad soils sampling campaign